EVALUASI PERCEPATAN PEMBANGUNAN PROYEK RUSUNAWA ASN PEMKAB MALANG MENGGUNAKAN METODE CRASHING DENGAN SISTEM SIHFT KERJA

Ninda Rizki Apriliana, Amri Gunasti, Totok Dwi Kuryanto

Abstract


In construction projects there are three things that must be considered, namely time, cost and quality. However, reality shows that there is still often a delay time of implementation. One way to overcome delay in construction projects is to do with the crashing. This research was conducted on the project of the construction of the building Rusunawa ASN Malang Regency. The method of crashing used by way
of a work shift. The calculation of the needs of the work shift using the guidelines for the calculation of Unit Price Analysis of Workers (AHSP) in 2018. The results showed that the project can be accelerated for 24 working days, so the duration of the project which was originally 197 working days to 173 days of work. Direct costs the project has increased from Rp.12.763.192.497.58 in 197 days to Rp. 12.937.000.000.00 in 173 days (up 1,3554%).


Keywords


Crashing, Unit Price Analysis of Workers 2018, shift work, and Rusunawa

References


Arija, W. F. (2017). Digital Digital Repository Repository Universitas Universitas Jember Jember Digital Digital Repository Repository Universitas Universitas Jember Jember Text Mining pada Media Sosial Twitter.

Caesaron, D., & Thio, A. (2015). Analisa penjadwalan waktu dengan metode jalur kritis dan pert pada proyek pembangunan ruko (jl. pasar lama no.20, glodok). 8(2), 59–82.

Frederika, A. (2010). ANALISIS PERCEPATAN PELAKSANAAN

DENGAN MENAMBAH JAM KERJA OPTIMUM PADA PROYEK KONSTRUKSI (STUDI KASUS: PROYEK PEMBANGUNAN SUPER VILLA, PETI TENGET-BADUNG). Jurnal Ilmiah Teknik Sipil, 14(2).

Hendriputri, A. A. (2018). PERCEPATAN JADWAL (CRASHING) MENGGUNAKAN SISTEM SHIFT DENGAN ANALISIS PDM (PRECENDENCE DIAGRAMMING METHOD) (CRASHING USING SHIFT SYSTEM WITH PDM (PRECEDENCE DIAGRAMMING

METHOD) ANALYSIS). Jurnal Ilmiah Teknik Sipil, 1.

Irwan, H. (2019). Crash Program Jalur Kritis Dengan Cara Overlapping (Study Review). Sigma Teknika, 2(1),14. https://doi.org/10.33373/sigma.v2i1.1 671

Kastawan Mandala, R. W. K. W. (2018). PENERAPAN NETWORK

PLANNING PADA PROYEK PEMBANGUNAN PERUMAHAN MUTIARA RESIDENCE DI DESA PENGAMBENGAN KABUPATEN JEMBRANA Rini Wijaya Kusuma Wardhani1 Kastawan Mandala2 1 , 2Fakultas Ekonomi dan Bisnis Universitas Udayana , Bali , Indonesia PENDAHULUAN Provi.7(12), 6731–6758. network planning,

critical path method, critical path.%0A6731

Nuhuyanan, T. T., & Sumarningsih, T. (2018). Percepatan proyek

pembangunan pengadilan negeri wonosari dengan metode shift kerja. Jurnal Ilmiah Teknik Sipil.

Oka Suputra, I. (2011). Penjadwalan Proyek Dengan Precedence Diagram Method (Pdm) Dan Ranked Position Weight Method (Rpwm). Jurnal Ilmiah Teknik Sipil, 15(1), 18–28.

Qomariyah, S., & Hamzah, F. (2013). Analisis Network Planning Dengan Cpm (Critical Path Method) Dalam Rangka Efisiensi Waktu Dan Biaya Proyek. 1(4), 408–416.

Rama, R., Elga, D., Wibowo, A., & Kistiani, F. (2016). Analisa

Percepatan Proyek Metode Crash Program Studi Kasus: Proyek

Pembangunan Gedung Mixed Use Sentraland. Jurnal Karya Teknik

Sipil, 5, 148–158.

Setiawan, B. B., Teknik, J., Universitas, S., Jakarta, M., Jurusan,

D., Sipil, T., & Muhammadiyah, U.(2012). Analisis Pertukaran Waktu Dan Biaya Dengan Metode Time Cost Trade Off ( Tcto ) Pada Proyek Pembangunan Gedung Di Jakarta. Jurnal Konstruksia, 4(1), 25–34.

Soeharto, I. (1999). Manajemen Proyek (Dari Konseptual

Sampai Operasional (2nd ed.). Erlangga.

Supriyanto. (2019). Optimasi waktu /proses produksi DI PT.

SUMIDEN SINTERED COMPONENT INDONESIA DENGAN TEKNIK ANALISA NETWORK/PERT DAN METODE SMED. 53(9), 1689–1699. https://doi.org/10.1017/CBO9781107415324.004




DOI: https://doi.org/10.32528/hgn.v5i1.3584

Refbacks

  • There are currently no refbacks.


View My Stats

 

Program Studi Teknik Sipil Fakultas Teknik

Universitas Muhammadiyah Jember

Alamat:  Jl. Karimata No. 49 Jember-Jawa Timur-Indonesia 68124

Phone & Fax: (0331)336728 | 337957

Email: hexagon@unmuhjember.ac.id

slot gacor slot gacor hari ini slot gacor 2025 demo slot pg slot gacor slot gacor