Table of Contents
EVALUASI PERCEPATAN PEMBANGUNAN PROYEK RUSUNAWA ASN PEMKAB MALANG MENGGUNAKAN METODE CRASHING DENGAN SISTEM SIHFT KERJA
DOI : 10.32528/hgn.v5i1.3584
Ninda Rizki Apriliana, Amri Gunasti, Totok Dwi Kuryanto
|
1-13
|
TINJAUAN KAPASITAS ABUTMEN JEMBATAN SENGKALING MALANG DENGAN BEBAN GEMPA
DOI : 10.32528/hgn.v5i1.3588
Nindi Rizki Apriliani, Pujo Priyono, Arief Alihudien
|
14-28
|
STUDI KUAT PENAMPANG ABUTMEN BETON BERTULANG DENGAN MUKA PENAMPANG YANG MIRING HORIZONTAL. JALAN TOL PANDAAN – MALANG JAWA TIMUR
DOI : 10.32528/hgn.v5i1.3589
Rahmat Hidayatullah, Pujo Priyono, Adhitya Surya Manggala
|
29-33
|
KAJIAN PENDUGAAN LETAK AKUMULASI AIR LINDI DENGAN METODE MAPPING RESISTIVITAS KONFIGURASI WENNER ( STUDI KASUS DI TPA PAKUSARI KAB. JEMBER )
DOI : 10.32528/hgn.v5i1.3590
Rivan Indra Pratama, Noor Salim, Rusdiana Setyningtyas
|
34-41
|
TINJAUAN STANDART KESTABILAN TOWER NG STANDAR 30 METER TERHADAP BEBAN GEMPA DINAMIS DENGAN BERBAGAI SITUS KELAS TANAH SESUAI SNI 1726-2012
DOI : 10.32528/hgn.v5i1.3591
Sigid Bayu Sudarmaji, Muhtar Muhtar, Pujo Priyono
|
42-52
|