Penerapan Metode CPM dan Crashing pada Proyek Gedung Training Center Universitas Jember Application of the CPM and Crashing Method in the Jember University Training Center Building Project

Delvania Armanda Putri, Muhtar Muhtar, Amri Gunasti

Abstract


During the construction project implementation period, there is often a mismatch between the planned schedule and the realization in the field, which can lead to additional time and implementation cost overruns. The causes of delays that often occur are due to changes in project situations, design changes, the influence of weather factors, inadequate needs of workers, materials, equipment, planning errors or specifications. Delay in completing the project itself is a very undesirable condition, because this can harm both parties in terms of both time and cost. Therefore, it is necessary to analyze the optimization of project duration so that it can be seen how long it will take for a project to be completed and look for the possibility of accelerating the project implementation time with the Crashing and CPM (Critical Path Method). Through the CPM analysis and crashing it can be seen that the optimum time due to the addition of working hours obtained a duration of 364 days, the difference between the normal duration of 97 days with a total cost of Rp. 5,840,312,916, while using the addition of labor, the difference between the normal duration of 88 days is 374 days and the cost is Rp. 4,412,522,242.


Full Text:

PDF

References


Alan Duta Prayogi, 2015. Percepatan Penjadwalan dan Waktu Pada Pembangunan Gedung Dengan Menggunakan Metode CPM dan PERT. Skripsi. Fakultas Teknik, Institut Teknologi Negeri Malang.

Agung, Hardianto, 2015. Pengendalian Manajemen Waktu dan Biaya Proyek Pembangunan Hotel dengan Metode CPM Surakarta. Skripsi. Fakultas Teknik. Universitas Muhammadiyah Surakarta.

Aldio Arya, 2017. Analisa Biaya percepatan optimal dengan penjadwalan ulang pada galangan kapal. Skripsi. Fakultas Teknik. Institut Teknologi Sepuluh Nopember. Surabaya.

Arum, 2018. Evaluasi waktu dan biaya dengan metode crashing pada proyek pembangunan rumah sakit UII. Skripsi. Universitas Islam Indonesia. Yogyakarta.

Ach. Rofiki, 2019. Penerapan Metode Barchat, CPM, PERT dan Crashing Project dalam Penjadwalan Proyek Pembangunan Gedung G Universitas Muhammadiyah Jember. Skripsi. Fakultas Teknik. Universitas Muhammadiyah Jember

Adirukmana Putra, 2019. Penjadwalan Produksi Untuk Meminimasi Makespam dan Jam lembur Menggunakan Backward Scheduling. Skripsi. Fakultas Teknik. Universitas Pembangunan Nasional “VETERAN”

Arief Rijaluddin., 2020. Penerapan penjadwalan waktu menggunaka metode CPM dan PERT pada pembangunan gedung instalasi rawat jalan RSUD Majalengka. Skripsi. Fakultas Teknik Universitas Majalengka

Dannyati, E, 2010. Optimalisasi pelaksanaan proyek dengan metode pert dan cpm. Skripsi. Fakultas ekonomi. Universitas diponogoro. Semarang.

Failen Pratasik, 2013. Menganalisa sensitivitas keterlambatan durasi proyek dengan metode CPM. Fakultas Teknik, Universitas Sam Ratulangi.

Fuji Astutik, 2015. Pengoptimalisasi Pelaksannan Proyek Pembangunan Gedung Pasca Sarjana IAIN Tulungagung Dengan Menggunakan Metode CPM. Skripsi. Fakultas ekonomi. Universitas Nusantara PGRI Kediri

Firdaus Hidayatul Iman, 2018. Evaluasi Penjadwalan Waktu Pada Proyek Pembangunan Rumah Tipe 30 Di Istana Tegal Besar Kabupaten Jember Dengan Metode CPM. Skripsi. Universitas Jember

Jevri, 2013. Analisa percepatan waktu proyek dengan tambahan biaya yang optimum.

Skripsi. Fakultas. Universitas MUhammadiyah Yogyakarta. Teknik Yogyakarta

Surya Perdana., 2019. Penerapan Manajemen Proyek Dengan Metode CPM Pada Proyek Pembangunan SPBE. Skripsi. Program Studi Teknik Industri. Universitas Indraprasta PGRI, Jakarta

Wahyu S., 2017. Analisa percepatan proyek menggunakan proyek crashing dengam penambahan jam kerja empat jam system shift. Skripsi. Fakultas Teknik. Universitas Islam Indonesia. Yogyakarta .

Yunita, Afliana, Messah 2013. Kajian penyebab keterlambatan pelaksanaan proyek kontruksi gedung di kota Kupang. Skripsi. Fakultas Teknik. Universitas Nusa Cendana. Kupang


Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.