ANALISIS PENENTUAN HARGA POKOK PRODUKSI PADA USAHA KECIL MENENGAH SENTRA PENGRAJIN BAMBU PADA UKM WAHANA BAMBU WILLIS GUNUNG SARI LOMBOK BARAT

Luh Nyoman Cinthya, Larasanty Larasanty, Animah Animah, Isnawati Isnawati

Abstract


The aim of this study was to determine (1) Calculation of the goods manufactured cost at SMEs, (2) Calculation of the goods manufactured cost based on full costing methods at SMEs ds manufactured cost supposed to be based on activity based costing system at SMEs,(3) Calculation of the goo and (4) Comparison of the
goods manufactured cost based on SMEs calculation, full costing methods, and activity based costing system. This was a case study research at “Wahana Bambu Wilis” located in Dasan Bara Hamlet, Taman Sari Village. The study results showed that the goods production cost per unit based on SMEs calculation was IDR 4,043,000 for bamboo berugak, IDR 683,226 for chair, IDR 300,246 for lazy cots, IDR 238,040 for shelves, and IDR 125,500 for bedek. Based on full costing methods, the calculation results was IDR 4,047,473 for bamboo berugak, IDR 699,165 for chair, IDR 316,271 for lazy cots, IDR 253,979 for shelves, and IDR 142,552 for bedek. Whereas with activity based costing system calculation cost of goods manufactured per unit was IDR 4,103,175 for bamboo berugak, IDR 709,598 for chair, IDR 302,759 for lazy cots, IDR 200,132 for shelves, and IDR 117,716 for bedek. The cost of goods manufactured calculated by SMEs was lower than the full costing methods. When compared with the activity based costing, there was an undercosting for SMEs, whereas the cost of goods manufactured was lower than activity based costing for bamboo berugak, chair and lazy cots with cost difference amounting IDR 60,175; IDR 26,372 and IDR 2,513. Cost of goods manufactured for shelves and bedek based on SMEs calculation was higher than activity based costing system that results on overcosting with cost difference amounting IDR 37,908 and IDR 7,784.


Keywords


Cost of Goods Manufactured (COGM), Full Costing, Activity Based Costing (ABC), Small and Medium Enterprises (SME)

References


Agraristanti, Dara Kartika. 2015. Perhitungan Harga Pokok Produksi Pada UKM Kue Risky. Skripsi. Institut Pertanian Bogor.

Blocher, Edward J., dkk. 2007. Manajemen Biaya Buku I. Edisi Ketiga. Terjemahan oleh Tim Penerjemah Salemba. Salemba Empat. Jakarta

Hartono, Jogiyanto. 2014. Metodologi Penelitian Bisnis. Edisi Keenam. BPFE. Yogyakarta.

Harnanto. 2017. Akuntansi Biaya – Sistem Biaya Historis. Andi dan BPFE. Yogyakarta.

Irton. 2009. Handbook Of Accounting - Buku Pegangan Akuntansi. Edisi Pertama. Unit Penerbit Dan Percetakan Sekolah Tinggi Ilmu Manajemen YKPN. Yogyakarta.

Ilham. 2013. Penentuan Harga Pokok Produksi Percetakan Sablon “Otakkanan Production” Di Yogyakarta. Skripsi. Universitas Diponegoro

Kurniasari, Dita, Anam Miftakhul Huda dan Endah Masrunik. 2018.

Analisis Perhitungan Harga Pokok Produksi dengan Metode Full Costing sebagai Penentu Harga Jual pada Produksi Opak Kembang Cap “KRESS’NO”. Riset & Jurnal Akuntansi, Vol. 2 No. 2: 73-87. Lestari, Wiwik dan Dhyka Bagus

Permana. 2017. Akuntansi Biaya Dalam Perspektif Manajerial. PT Rajagrafindo Persada. Depok.

Muzakki, Agus Anta. 2017. Analisis Perhitungan Harga Pokok Produksi Dengan Metode Activity Based Costing Sebagai Dasar Penentuan Harga Jual -Studi Kasus UKM Rak Soe Ha di Malang. Skripsi. Universitas Islan Negeri Malang.

Purwaji, Agus, Wibowo dan Sabarudin Muslim. 2016. Akuntansi Biaya. Edisi Kedua. Salemba Empat. Jakarta.

Rahayu, Dwi Inggarwati dan Afif Fitriyani. 2017. Analisis Penerapan Sistem Activity Based Costing Dalam Penentuan Harga Pokok Produksi Pada Usaha Kecil Menengah -UKM -Studi Kasus Pada UD. Tahu Sutra. Jurnal Fakultas Ekonomi, Volume 06 Nomor 02: 138-155.

Sugiyono. 2013. Metode Penelitian Kuantitatif, Kualitatif, Dan Kombinasi -Mixed Methods. Alfabeta. Bandung.

Sari, Ratih Ardia et al. 2018. Penentuan Harga Produk Kerajinan Rotan Berbasis Aktivitas. Jurnal Teknik Industri ITN Malang: 15-20.

Tika, Elisa Rohma Hindar. 2015. Penentuan Harga Pokok Produksi

pada UKM Anugrah Alam Surabaya. Artikel Ilmiah. Sekolah Tinggi Ilmu Ekonomi Perbanas.

Yulianti, Ika et al. 2018. Implementasi Job Order Costing Method Dalam Perhitungan Harga Pokok Produksi Map. Jurnal eBA, Vol. 4 No. 2: 43-55. Data Potensi Industri Formal Dan Non Formal Kabupaten Lombok Barat Tahun 2018.




DOI: https://doi.org/10.32528/jiai.v4i2.2657

Refbacks

  • There are currently no refbacks.


Copyright (c) 2019 JIAI (Jurnal Ilmiah Akuntansi Indonesia)

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

View My Stats
slot gacor slot gacor hari ini slot gacor 2025 demo slot pg slot gacor slot gacor