DETERMINAN KINERJA BIAYA DAN WAKTU PROYEK KONSTRUKSI DI INDONESIA DITINJAU DALAM KONTEKS ISLAMI
Abstract
Keywords
Full Text:
PDF (Bahasa Indonesia)References
Alhammadi, A. S. A. M. (2020). Inhibiting factors of cost performance in uae construction projects. International Journal of Sustainable Construction Engineering and Technology, 11(2), 126–132. https://doi.org/10.30880/ijscet.2020.11.02.014
Amusan M, L., Afolabi, A., Ojelabi, R., Omuh, I., & Okagbue I., H. (2018). Data exploration on factors that influences construction cost and time performance on construction project sites. In Data in Brief (Vol. 17, pp. 1320–1325). https://doi.org/10.1016/j.dib.2018.02.035
Anita. (2015). Effect of design management on cost performance of construction projects. In ISEC 2015 - 8th International Structural Engineering and Construction Conference: Implementing Innovative Ideas in Structural Engineering and Project Management (pp. 1347–1352). https://doi.org/10.14455/isec.res.2015.177
Cahyono, D. (2020). Kapasitas Sumber Daya Manusia, Pemanfaatan Teknologi Informasi Dan Pengendalian Intern Terhadap Nilai Informasi Pelaporan Keuangan. International Journal OF Social Science AND Business, 4(1), 116–122.
Chen, B. (2014). Robust optimization for transmission expansion planning: Minimax cost vs. minimax regret. IEEE Transactions on Power Systems, 29(6), 3069–3077. https://doi.org/10.1109/TPWRS.2014.2313841
Egwunatum, S. I. (2021). Predicting Cost Performance of Construction Projects from Projects Procurement Procedure. Journal of Engineering, Project, and Production Management, 11(3), 181–195. https://doi.org/10.2478/jeppm-2021-0018
Elger, D. (n.d.). Theory of Performance. 11–14.
Fathiah, K. S., Martini, N. N. P., Sanosra, A., & Qomariah, N. (2021). The Impact of Competence and Work Environment on Employee Motivation and Performance in The Financial and Asset Management Division. Calitatea, 22(185), 52–63.
finance.detik.com. (2022). Duh! Evergrande Jadi Perusahaan Properti Dengan Utang Terbesar di Dunia. https://finance.detik.com/properti/d-5946400/duh-evergrande-jadi-perusahaan-properti-dengan-utang-terbesar-di-dunia
Foo, L. C. (2022). No Importance Level Of Management Factors In Affecting Time And Cost Performance In Construction Projects. 01(01), 1–6.
Franco-Duran, D. M., & Guillermo, M. A. (2016). Assessing the Cost Forecasting Performance in Construction Projects through Data Envelopment Analysis. In Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, CRC 2016 (pp. 2039–2049). https://doi.org/10.1061/9780784479827.203
Francom, T. (2014). Using alternative project delivery methods to enhance the cost performance of trenchless construction projects. In Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress (pp. 1219–1228). https://doi.org/10.1061/9780784413517.0125
Ghozali, I. (2016). Aplikasi Analisis Multivariate dengan Program IBM SPSS 21 :Update PLS Regresi. Semarang. https://doi.org/10.2307/1579941
Hwang, B.-G., Zhu, L., Wang, Y., & Cheong, X. (2017). Green Building Construction Projects in Singapore: Cost Premiums and Cost Performance. In Project Management Journal (Vol. 48, Issue 4, pp. 67–79). https://doi.org/10.1177/875697281704800406
Jeffrey, H. J., & Jeffrey, H. J. (2014). Expanding the Range of Behavioral Factors in Economic Simulations Expanding the Range of Behavioral Factors in Economic Simulations. October, 37–41. https://doi.org/10.1207/s15427579jpfm0702
Kar, S. (2020). Examining the Effect of Material Management Issues on the Schedule and Cost Performance of Construction Projects Based on a Structural Equation Model: Survey of Indian Experiences. Journal of Construction Engineering and Management, 146(9). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001906
Karimi, H., Taylor R.B., T., Dadi B., G., Goodrum M., P., & Srinivasan, C. (2018). Impact of Skilled Labor Availability on Construction Project Cost Performance. Journal of Construction Engineering and Management, 144(7). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001512
Khafri, A. A. (2018). Empirical study of relationship between cost performance index stability and project cost forecast accuracy in industrial construction projects. In CSCE General Conference 2018, Held as Part of the Canadian Society for Civil Engineering Annual Conference 2018 (pp. 269–276). https://api.elsevier.com/content/abstract/scopus_id/85073527809
Kim, J. J. (2022). Comparing Cost Performance of Project Delivery Methods Using Quantifiable RFIs: Cases in California Heavy Civil Construction Projects. International Journal of Civil Engineering, 20(3), 323–335. https://doi.org/10.1007/s40999-021-00658-0
Kim, Y. W. (2019). The impact of make-ready process on project cost performance in heavy civil construction projects. Production Planning and Control, 30(13), 1064–1071. https://doi.org/10.1080/09537287.2019.1567858
Li, Y., Al-Haddad, S., Taylor R.B., T., Goodrum M., P., & Sturgill E., R. (2019). Impact of Utilizing Construction Engineering and Inspection Consultants on Highway Construction Project Cost and Schedule Performance. Transportation Research Record. https://doi.org/10.1177/0361198119854086
Meeampol, S., & Ogunlan, S. O. (2006). Factors affecting cost and time performance on highway construction projects: Evidence from Thailand. Journal of Financial Management of Property and Construction, 11(1), 3–20. https://doi.org/10.1108/13664380680001076
Msiska, U., & Mashwama, N. (2022). Impact of Variation Orders on Construction Project Cost and Time Didibhuku Thwala SARChI in Sustainable Construction Management and Leadership in the Built Environment. 5–7.
Nabi, M. A. (2021). Risk-Based Approach to Predict the Cost Performance of Modularization in Construction Projects. Journal of Construction Engineering and Management, 147(10). https://doi.org/10.1061/(ASCE)CO.1943-7862.0002159
Nuha, G. A., Yuliarti, N. C., & Nartati, Y. (2022). Management of Productive Zakat, Infaq, Shadaqah Funds Through Linkage Program In Covid-19 Pandemic Era. IQTISHODUNA: Jurnal Ekonomi Islam, 11(2), 267–276.
O.I. Aje, K.T. Odusami, D. R. O. (2008). Journal of Financial Management of Property and Construction. Journal of Financial Management of Property and Construction, 13(1). https://doi.org/10.1108/jfmpc.2008.37613aaa.002
Olaniran, O. J. (2015). The effects of cost-based contractor selection on construction project performance. Journal of Financial Management of Property and Construction, 20(3), 235–251. https://doi.org/10.1108/JFMPC-06-2014-0008
Olatunde, N. A., & Alao, O. O. (2017). Quantitative appraisal of cost and time performance of construction projects in public and private universities in Osun State, Nigeria. Journal of Engineering, Design and Technology, 15(5), 619–634. https://doi.org/10.1108/JEDT-11-2016-0081
Perera, B. A. K. S. (2022). Contractor’s Perspective on Key Performance Indicators of Cost Control in Asian, Middle Eastern, and European Construction Projects. International Journal of Construction Education and Research, 18(3), 217–233. https://doi.org/10.1080/15578771.2020.1842567
Peter E.D. Love, L. A. I. (2021). The ‘context’ of transport project cost performance: Insights from contract award to final construction costs. Research in Transportation Economics, 90. https://doi.org/10.1016/j.retrec.2021.101062
Pratiwi, R., Devi, S. M., Marini, A., Sari, H. M., Studi, P., Sipil, T., Balikpapan, U., Studi, P., Sipil, T., & Tridharma, U. (2022). Optimasi Waktu Dan Biaya Dengan Metode Time Cost Trade Off (TCTO) Pada Proyek Penambahan Bangunan Pasar Rakyat. 1, 93–105.
Probowulan, D. (2022). The Sustainability of Pervasive Learning in Accounting Education: Strategy in the Transition of “Merdeka Belajar-Kampus Merdeka.” Jurnal Akuntansi Dan Keuangan, 24(1), 24–33.
Roziq, A., Yulinartati, Y., & Yuliarti, N. C. (2022). Model of Productive Islamic Social Fund Management for Poor Empowerment. International Journal of Professional Business Review: Int. J. Prof. Bus. Rev., 7(5), 4.
Rukajat, A. (2018). Pendekatan Penelitian Kualitatif (Qualitative Research Approach). Penerbit Deepublish.
Safapour, E. (2022). Selection of Best Practices that Enhance Phase-Based Cost and Schedule Performances in Complex Construction Projects. EMJ - Engineering Management Journal. https://doi.org/10.1080/10429247.2022.2036068
Simanjuntak, M. R. A. (2020). Project Cost Risk Identification and Construction Performance Indicators of High-rise Building in DKI Jakarta (Case Study: Pt. X). In IOP Conference Series: Materials Science and Engineering (Vol. 852, Issue 1). https://doi.org/10.1088/1757-899X/852/1/012031
Sinesilassie, E. (2018). Critical factors affecting cost performance: a case of Ethiopian public construction projects. International Journal of Construction Management, 18(2), 108–119. https://doi.org/10.1080/15623599.2016.1277058
Sullivan, J., Asmar, M. El, Chalhoub, J., & Obeid, H. (2017). Two Decades of Performance Comparisons for Design-Build, Construction Manager at Risk, and Design-Bid-Build: Quantitative Analysis of the State of Knowledge on Project Cost, Schedule, and Quality. Journal of Construction Engineering and Management, 143(6). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001282
Susbiyani, A., Halim, M., & Animah, A. (2023). Determinants of Islamic social reporting disclosure and its effect on firm’s value. Journal of Islamic Accounting and Business Research, 14(3), 416–435.
Witjaksana, B., & Ali, A. (2019). Efficiency as a variable intervening in activity based management of change order and economic value added to improve project cost performance on building construction. In Proceedings of the International Conference on Industrial Engineering and Operations Management (pp. 1307–1311). https://api.elsevier.com/content/abstract/scopus_id/85079279646
Zadawa, A N. (2018). Mediating effects of enforcement on public procurement guidelines’ compliance barriers and cost performance of construction projects in Nigerian Federal Universities: A process macro approach. Journal of Construction in Developing Countries, 23(1), 81–102. https://doi.org/10.21315/JCDC2018.23.1.5
Zadawa, Abdullahi Nafiu, Hussin, A. A., & Osmadi, A. (2018). The mediating effects of awareness on the relationship between procurement manual compliance’s barriers and cost performance of construction projects. Planning Malaysia, 16(2), 197–206. https://api.elsevier.com/content/abstract/scopus_id/85053376248
Zadawa, Abdullahi Nafiu, & Osmadi, A. (2017). Mediation effects of innovative procurement practices between the determinants of non-compliance with public procurement guidelines and construction project cost performance in the Nigerian construction industry. WIT Transactions on Ecology and the Environment, 210, 99–109. https://doi.org/10.2495/SDP160091
DOI: https://doi.org/10.32528/jiai.v8i2.22140
Refbacks
- There are currently no refbacks.
Copyright (c) 2023 JIAI (Jurnal Ilmiah Akuntansi Indonesia)
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
View My Stats