Table of Contents
EVALUASI KAPASITAS STRUKTUR GEDUNG MEOTEL BY DAFAM JEMBER DENGAN METODE PUSHOVER ANALYSIS
DOI : 10.32528/hgn.v3i2.2911
Ajeng Safira Kusuma Wardhani, Pujo Priyono, Adhitya Surya Manggala
|
|
STUDI PERKUATAN GEOTEXTILE PADA LERENG DENGAN VARIASI KEMIRINGAN DAN JARAK PONDASI DANGKAL MELALUI PEMODELAN DI LABORATORIUM
DOI : 10.32528/hgn.v3i2.2912
Edo Caraka Yodha, Arief Alihudien, Pujo Priyono
|
|
STUDI ALTERNATIF KONSTRUKSI JALAN MENGGUNAKAN KONSTRUKSI TIMBUNAN DENGAN TANAH DASAR DIPERBAIKI MENGGUNAKAN KOMBINASI PRELOADING DAN PREFABRICATED VERTICAL DRAIN
DOI : 10.32528/hgn.v3i2.2913
Kholifatur Rosidatul Jannah, Arief Alihudien, Suhartinah Suhartinah
|
|
PERBANDINGAN ESTIMASI ANGGARAN BIAYA DAN SCHEDULE PROYEK PEMBANGUNAN RUMAH SAKIT AL HUDA BANYUWANGI MENGGUNAKAN METODE SNI DAN METODE BOW
DOI : 10.32528/hgn.v3i2.2914
Mohammad Riski Setio Budi, Suhartinah Suhartinah, Adhitya Surya Manggala
|
|
STUDI KEKUATAN STABILITAS ABUTMENT PADA JALAN TOL PANDAAN – MALANG STA 15 + 916 TERHADAP PENGARUH GEMPA SESUAI DENGAN SNI 2833 – 2016
DOI : 10.32528/hgn.v3i2.2915
Lilonna Ayu Heragita, Pujo Priyono, Suhartinah Suhartinah
|
|
KAJIAN SEDIMENTASI DI SUNGAI SAMPEAN BONDOWOSO MENGGUNAKAN PROGRAM HEC-RAS VERSI 4.1
DOI : 10.32528/hgn.v3i2.2916
Khafid Iswahyudi, Noor Salim, Taufan Abadi
|
|
STUDI PERKUATAN TANAH DASAR DI BAWAH EMBANKMENT MENGGUNAKAN METODE KOMBINASI PRELOADING DAN PVD
DOI : 10.32528/hgn.v3i2.2917
Dedy Dana Fahrur Rizal, Arief Alihudin, Adhitya Surya Manggala
|
|
ANALISA DESAIN FLY OVER DAN SLAB ON PILE PADA PERENCANAAN JALAN LINGKAR BARAT KOTA SURABAYA
DOI : 10.32528/hgn.v3i2.3215
Ilanka Cahya Dewi, Pujo Priyono
|
|
Rusdiana Setyaningtyas, Anis Artiyani
|
|